Butimanu

Projects · Romania

Butimanu187 MW

Dâmbovița County, Romania2025–2026In progress

187 MWbuilt by our team
≈ 322,000modules (estimated)
155people on site at peak

About the project

One of the largest solar parks under construction in Eastern Europe. Two scopes run in parallel: mechanical (pile driving, structures and module mounting) and electrical (DC/AC cabling, connections and commissioning).

Works carried out

  • Setting out and pile driving
  • Mounting structures
  • Module installation
  • DC/AC cabling
  • Connections and commissioning

Project carried out by the SMACO team while working for a previous company.

The module count is estimated from the capacity (about 580 Wp per module); exact quantities come from the site reports.

From the site

Tap a photo to see it larger.

ButimanuButimanuButimanuButimanu